Phone +49 39268/9896-0 info@lacont.de

New realized projects

Turnkey - everything from a single source!

New realized projects

Realisation: October 2024

Location: Erfurt

Water protection container system

  • Passive storage of flammable liquids
  • Capacity: 88 IBC
  • Corridor roofing width 5.8 m
  • Daylight system with DIBt approval
  • Electrical equipment
  • Lighting Ex zone 2

Realisation: September 2024

Location: Berlin

Waste storage for water-polluting substances

  • 3 water protection compartment containers
  • Capacity: 60x 200-litre drums
  • Weatherproof enclosure
  • Electrical equipment
  • Lighting

Realisation: August 2024

Location: Komàrno (Slovakia)

Central machine oil store

  • 10 pieces Water protection compartment container WSC-F-D.3-60
  • Capacity: 720x 200-litre drums
  • Total storage capacity 144,000 litres
  • three storage levels
  • Operable from both sides